SOUTHEAST ELEVATOR RESOURCE LIBRARY RESIDENTIAL ELEVATOR Southeast Elevator Brochure Southeast Elevator Photo Gallery Brochure Southeast Elevator Configuration Examples Overhead Drum and Hydraulic Equipment Rail Bracket Details Door Notch Specs Shaft Specs RH 60 x 60" Shaft Configuration Typical Elevator Hoistway and Door Code Hoistway Swing Doors OUTDOOR ELEVATORS AND LIFTS Outdoor Elevator and Lift Brochure ODE Tower Support ODE Maintenance ODE Planning Guide ODE Planning Guide ODE Gen II Carriage Options ODE 500, 750 Windload Pit Requirements Generic ODE 750 Approval Drawing Generic ODE 500 Approval Drawing PVE PVE Vacuum Elevator Brochure PVE Vacuum Elevator Resources SAVARIA Savaria 1504 Brochure Savaria 1504 Planning Guide Savaria 1504 Owner's Manual Savaria Lux Prestige Brochure Savaria Color Chart Trus-T Lift Trus-T Lift 750 Brochure Trus-T Lift Standard Configuration Gates Accordion Gates Scissor Gates Autocad drawings Door Notch Flush Mount Doors Overhead and Hydraulic RH 60x60" Shaft Configuration Rail Bracket Jobsite Forms Site Measure Requirements - Indoor ElevatorJobsite Readiness – Indoor ElevatorOwner/Contractor(Required)Project Address(Required) Street Address City State / Province / Region ZIP / Postal Code The following items must be completed onsite for us to site measure for fabrication(Required) Stairway onsite (preferred) Shaft, including door openings, is completely framed/blocked up Shop drawings received Shop drawings approvedRail wall(Required)When standing at the 1st landing looking into the shaft, the rails will be mounted on which wall? Back wall Left wall Right wallLocation of elevator equipment in relation to elevator shaft.(Required)Example: behind the left wall at 2nd landing or approx. 20′ from the shaft in a storage area under the stairs.Door swings marked onsite(Required) Yes NoLanding 1 LHOS RHOSLanding 2 LHOS RHOSLanding 3 LHOS RHOS N/ALanding 4 LHOS RHOS N/ALanding 5 LHOS RHOS N/AIn the event that this form contains invalid information and Southeast Elevator cannot complete its scheduled work, you are subject to applicable charges. This document should indicate the current site conditions.Site Measure Responsibility(Required)I understand that the elevator cab and shaft materials will be fabricated per the onsite dimensions taken at the time of the site measure. It is the contractor’s responsibility to notify Southeast Elevator of any changes. Fees may apply if the fabrication has already begun. YesNotes/CommentsConfirmation(Required) I attest to the accuracy of the information provided.Date(Required) MM slash DD slash YYYY Name(Required) First Last TitleCAPTCHA Jobsite InformationJob Site InformationEquipment Type(Required) Hydraulic Overhead Drum Pitless Commercial Style DoorsContractor/Owner(Required)Project Name/Address(Required)Alternate AddressIf the project address does not register on maps yet, use this alternate address.Work is allowed to start at:(Required) Hours: Minutes AM/PMAMPM AM/PMWork hours end at:(Required) Hours: Minutes AM/PMAMPM AM/PMOur typical workday ends at 5:30 PMCommunity NameIs Southeast Elevator added to the Vendors List for community access? Yes NoIs an ID card or badge required to enter the community? Yes NoProperty's Access Code(Required)Enter N/A if it’s not requiredOnsite Superintendant(Required)PhoneEmail Project Manager(Required)PhoneEmail Status of construction onsite as of:(Required) MM slash DD slash YYYY Job Type(Required) New Home Existing HomeNew Home Construction(Required) Slab/Base/Foundation Shell Interior Framing Drywall Finished House with PowerExisting Home:(Required) Remove and replace existing elevator Construction is specific to elevator only Extensive home renovation not specific to elevator Home is occupiedEstimated Timeline(Required)Elevator shaft framing/block complete MM slash DD slash YYYY Estimated Timeline(Required)Elevator shaft finishes are complete including doors and hardware MM slash DD slash YYYY Comments/Notes Inline Jobsite Measurements Front Rear Jobsite Measurements Adjacent Left Jobsite Measurements Adjacent Right Jobsite Measurements